Header

..
Home Page html/About_us.gif (1615 bytes) Products page html/Prod_profile.gif (2226 bytes) html/Faqs.gif (1281 bytes) html/Customers.gif (1969 bytes) html/Contact_us.gif (1869 bytes)
..
.Shop Online..

html/Replaceable_text11.gif (6003 bytes)

..
  •  
Take out Live Centre from tailstock of machine and hold its Bullet full tight in bench vice or chuck.(Fig.2) Maintain gap between its front face and vice top.
..
  •  
Remove Seal Plug at the end of MT shank, by pulling. (Fig.1)
  •  
Insert  special Allen Key through a hole in shank to engage it with the Allen bolt inside. Rotate Housing if you find engagement of Allen Key difficult. (Fig 2)
..
  •  

Use hollow pipe of specified length as a leverage to Allen key. Unscrew the Bullet.(Fig.3). Take out entire centre from vice and remove loose Bullet  by rotating.(Fig.4) It is not necessary to thrust Allen key to remove Bullet. Please note all threads are Right Hand.

..
  •  

Clean spare Bullet with cloth and not cotton-waste. Fit it by rotating in Live Centre. Hold it in vice as earlier and tighten using same leverage. Fit Seal Plug back in place. Now Live Centre is ready for use with changed  Bullet.

With this simple procedure and basic care PRASHTECH LIVE CENTRES will give you trouble-free performance and controlled run-out.

..
  •  

Leverage specified (Length  of pipe):                                       

MT-3   150mm 
MT-4,   MT-5 &MT-6  200mm

                 

 

Home   |  About Us    |  Products  |  Products Profile  |  Faqs  | CustomersContact Us

Login   |  Privacy Policy  |  View Cart  |  Credits   |  Feed BackHelp